1/05/2026 Hot Work SpecificationUPDATES:- Clarify the exception to when a 30 minute Fire Watch is required.- Hot Works are not to be conducted in an area in which a Fire Impairment notice has been issued unless appropriate controls to mitigate a fire have been placed.
28/04/2026 Stockyard Access Permit FormUPDATE: Row 7 of section B checklist red box moved to “yes”.
31/03/2026 Grid Mesh, Flooring, and Handrail Removal SpecificationUPDATE: Section 4.2 ACCEPTABLE WORK CONTROLS- Dot point 1- change wording to “Isolate the restricted work area by a rigid barricade (as a primary control.”Barricade and Safety Signage SpecificationUPDATE: Section 5.2.6 Solid Barricade- Remove reference to “Competent person” installing a hard barricade- Additional requirement – “An outward opening gate can be installed where access to a penetration is required. In this case no kick plate is required.”
Grid Mesh, Flooring or Handrail Removal Permit FormUPDATES:- Addition of PART C – Permit Activation section- Addition of PART D – Permit Closure section- minor rewording
6/01/2026 Freight Hazard Analysis Form & T4 Forklift OperationUPDATE:
26/11/2025 Incident and Corrective Action Reporting SpecificationUPDATE: Document has been updated to include a definition of a Missed Sailing window in the Appendix.