Recent Document Updates

07/07/2025 Risk Management Standard
UPDATE:  More detail added into Section 3.3.4 in regards to the assigning of priority rankings and Hierarchy of Control to actions.

02/09/2025 Isolation of Plant and Equipment Specification
UPDATE:  Authorisation for isolation witness

16/09/2025 Safe Working at Height Specification
UPDATE: 

  • Section 2 - added dot point - Exposed to a risk of fall from one level to another
  • Section 4.3 - added dot point to tasks that need particular attention - Using a safety step or ladder to work within two (2) metres of a handrailed location
  • Appendix 1 - Other - adding in specific sections of the relevant Australian Standards

29/09/2025 Severe and Extreme Weather - Trigger Action Response Plan added sections as per below:

    • Level 1 trigger for Rain: 50 to 100mm (24 hours)
      - Inspect stockyard conditions. Restrict access to stockyard if required.
      - drains and collection pits are empty.
    • Level 2 trigger Rain: 100mm to 150mm (24 hours)
      - Restrict access to stockyard for all auxiliary mobile equipment i.e. loader, grader, drum roller.
      -drains and collection pits are empty.
    • level 3 trigger lightning
      - If a vessel Tie-up or Let-go has to be completed during this time, the lines crew are to follow Section 6. Appendix A operating under a yellow/red lightning alert, from their Vessel Mooring Services Prestart.

    15/10/2025 Scaffolding Specification
    UPDATE: The change is around the length of time to which a scaffold must be inspected.

    A Scaffold inspection must be completed a maximum of every twenty-eight (28) days from last inspection, or initial erection date.

    Note, for scaffolds that are complex in design and subject to high loading (eg. during painting or blasting), or exposed to severe weather conditions (eg. cyclones or tidal impacts), reinspection intervals may be shortened.

    This revised timeframe must be specified at handover by the constructor or WICET representative and clearly recorded on the scaffold tag and register.